[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858246":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858246,535,2,"多选题","建筑工程设计文件一般分为()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","初步设计",true,{"key":16,"text":17,"correct":18},"B","详细设计",false,{"key":20,"text":21,"correct":14},"C","施工图设计",{"key":23,"text":24,"correct":18},"D","机械设计",{"key":26,"text":27,"correct":18},"E","设备设计","AC","建筑工程设计文件一般分为初步设计和施工图设计两个设计阶段。大型复杂的建筑工程设计要经过初步设计、施工图设计两个阶段，小型简单建筑工程设计只作施工图设计。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]