[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858239":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858239,535,2,"多选题","下列选项中，可用于BIM协调性成本预算和工程量估算协调的工程信息包括()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","工程量",true,{"key":16,"text":17,"correct":14},"B","设计参数",{"key":19,"text":20,"correct":14},"C","工程参数",{"key":22,"text":23,"correct":24},"D","几何信息参数",false,{"key":26,"text":27,"correct":24},"E","施工信息","ABC","BIM协调成本预算、工程量估算协调指的是应用BIM技术可以为造价工程师提供各设计阶段准确的工程量、设计参数和工程参数，这些工程量和参数与技术经济指标结合，可以计算出准确的估算、概算，再运用价值工程和限额设计等手段对设计成果进行优化。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]