[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858218":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858218,535,2,"多选题","BIM技术在设计阶段中设计分析包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","协同设计",false,{"key":16,"text":17,"correct":18},"B","节能分析",true,{"key":20,"text":21,"correct":18},"C","安全疏散分析",{"key":23,"text":24,"correct":18},"D","结构分析",{"key":26,"text":27,"correct":14},"E","资产设备分析","BCD","协同设计是贯穿整个设计阶段的一种设计方式，资产设备分析是属于运维阶段的内容。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]