[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858216":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858216,535,2,"多选题","设备施工图按专业不同，可分为()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","给水排水图",true,{"key":16,"text":17,"correct":14},"B","电气图",{"key":19,"text":20,"correct":14},"C","弱电图",{"key":22,"text":23,"correct":24},"D","采光图",false,{"key":26,"text":27,"correct":14},"E","动力图","ABCE","没有采光图这种说法。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]