[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858172":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},858172,535,1,"单选题","在《建筑工程设计信息模型交付标准》中建议初步设计阶段模型精细度应为()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","100LOD",false,{"key":16,"text":17,"correct":14},"B","200LOD",{"key":19,"text":20,"correct":21},"C","300LOD",true,{"key":23,"text":24,"correct":14},"D","400LOD","100LOD对应的是勘察阶段及概念化设计阶段；200LOD对应的是方案设计阶段；400LOD对应的是虚拟建造阶段\u002F产品预制阶段\u002F采购阶段\u002F验收阶段\u002F交付阶段。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]