[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858164":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},858164,535,1,"单选题","缩短工期、降低工程造价、提升工程质量是属于()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","A项目目标",true,{"key":16,"text":17,"correct":18},"B","B公司目标",false,{"key":20,"text":21,"correct":18},"C","C地方目标",{"key":23,"text":24,"correct":18},"D","D行业目标","工期、造价、工程质量是针对项目的目标，故选A。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]