[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858107":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},858107,535,1,"单选题","VDC模式的工作流程在设计阶段和施工阶段中间加入了()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","深化设计阶段",false,{"key":16,"text":17,"correct":14},"B","优化设计阶段",{"key":19,"text":20,"correct":21},"C","预建造阶段",true,{"key":23,"text":24,"correct":14},"D","概算阶段","VDC工作流程在设计阶段和施工阶段中加入了预建造阶段。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]