[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858087":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},858087,535,1,"单选题","在合同与成本管理中，BIM模型与业务数据集成后，实现()的三算对比。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","造价、预算、收入",false,{"key":16,"text":17,"correct":14},"B","投资、造价、预算",{"key":19,"text":20,"correct":21},"C","预算、收入、支出",true,{"key":23,"text":24,"correct":14},"D","投资、收入、支出","BIM模型与业务数据集成后，实现预算、收入、支出的三算对比。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]