[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858086":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},858086,535,1,"单选题","在BIM团队中下面哪一项职责是BIM专业负责人的职责？()",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","参与BIM决策",false,{"key":16,"text":17,"correct":18},"B","负责专业内部任务分工",true,{"key":20,"text":21,"correct":14},"C","制定BIM工作计划",{"key":23,"text":24,"correct":14},"D","提供技术指导","BIM专业负责人职责：负责本专业内部的任务分工及协调、将工程项目中每天的进程和遇到的问题准确反映在BIM模型之中，提供给项目经理作管理决策、BIM专业负责人在项目管理中是最直接的操作者和信息的提供者。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]