[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858074":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},858074,535,1,"单选题","BIM在机电工程中施工组织设计流程第一项是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","毽立轴网标高",false,{"key":16,"text":17,"correct":14},"B","建立中心文件",{"key":19,"text":20,"correct":14},"C","建立本地文件",{"key":22,"text":23,"correct":24},"D","建立项目样板",true,"BIM在机电工程中施工组织设计流程首先要建立项目样板。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]