[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858068":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},858068,535,1,"单选题","下面哪一项不是BIM在运维阶段的应用内容？()",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","机械通风",false,{"key":16,"text":17,"correct":14},"B","垂直交通",{"key":19,"text":20,"correct":21},"C","结构维护",true,{"key":23,"text":24,"correct":14},"D","温度监测","BIM运维阶段的主要内容有：机械通风、垂直交通、温度监测、水平衡、组合信息、地下室设备、视频监控、数据分析等。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]