[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858062":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},858062,535,1,"单选题","下面哪一项是BIM深化设计协调管理流程的首要步骤()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","定制统一的标准",false,{"key":16,"text":17,"correct":18},"B","建立规范文件存储体系",true,{"key":20,"text":21,"correct":14},"C","深化设计变更管理",{"key":23,"text":24,"correct":14},"D","竣工模型管理","BIM深化设计协调管理流程：建立规范文件存储体系，定制统一的标准，深化设计变更管理，竣工模型管理。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]