[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858044":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},858044,535,1,"单选题","下列不属于BIM技术在运维阶段应用的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","机械通风",false,{"key":16,"text":17,"correct":14},"B","租户能源使用情况",{"key":19,"text":20,"correct":21},"C","项目成本管理",true,{"key":23,"text":24,"correct":14},"D","水平衡","项目成本管理是属于施工阶段的内容。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]