[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858022":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},858022,535,1,"单选题","()是指对已经完成的项目或规划的目的、执行过程、效益、作用和影响所进行的系统、客观的分析。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目后评价",true,{"key":16,"text":17,"correct":18},"B","项目总结",false,{"key":20,"text":21,"correct":18},"C","项目评估",{"key":23,"text":24,"correct":18},"D","项目后分析","项目后评价的定义。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]