[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858001":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},858001,535,1,"单选题","项目采购管理是为了从项目实施组织之外获得所需资源或服务所采取的一系列管理过程。它包括项目质量规划，项目质量控制和()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目质量保证",true,{"key":16,"text":17,"correct":18},"B","项目质量监督",false,{"key":20,"text":21,"correct":18},"C","项目质量检验",{"key":23,"text":24,"correct":18},"D","项目质量评估","项目质量控制的三个过程。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]