[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857996":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857996,535,1,"单选题","BIM技术在设计阶段主要任务不包括( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","进度控制",false,{"key":16,"text":17,"correct":14},"B","造价控制",{"key":19,"text":20,"correct":14},"C","安全管理",{"key":22,"text":23,"correct":24},"D","项目可行性验证",true,"BIM在设计阶段的主要任务是：进度控制、造价控制、安全管理、质量控制、信息管理、合同管理、组织与协调。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]