[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857992":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857992,535,1,"单选题","BIM在项目管理中的优势不包括()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","基于BIM技术，可对投标书、进度审核预算书、结算书进行统一管理，并形成数据对比",false,{"key":16,"text":17,"correct":14},"B","BIM数据模型保证了各项目的数据动态调整，可以方便统计，追溯各个项目的现金流和资金状况",{"key":19,"text":20,"correct":14},"C","使进度计划和施工方案最优，在短时间内说明问题并提出相应的方案，再用来指导实际的项目施工",{"key":22,"text":23,"correct":24},"D","业主方在建设工程不同的阶段可自行或委托进行项目前期的开发管理、项目管理和设施管理",true,"",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]