[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857985":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857985,535,1,"单选题","建设项目设计阶段的主要责任方为初步设计方和()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","业主方",false,{"key":16,"text":17,"correct":14},"B","监理方",{"key":19,"text":20,"correct":14},"C","施工方",{"key":22,"text":23,"correct":24},"D","施工图设计方",true,"建设项目设计阶段，初步设计方和施工图设计方为主要责任方。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]