[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857982":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},857982,535,1,"单选题","方案设计阶段的BIM应用主要是利用BIM技术对项目的( )进行验证，对下一步深化工作进行推导和方案细化。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","合理性",false,{"key":16,"text":17,"correct":14},"B","经济性",{"key":19,"text":20,"correct":21},"C","可行性",true,{"key":23,"text":24,"correct":14},"D","持续性","方案设计阶段的BIM应用主要是利用BIM技术对项目的可行性进行验证，对下一步深化工作进行推导和方案细化。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]