[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857972":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857972,535,1,"单选题","以下不属于设计方项目管理内容的是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","与设计有关的安全管理",false,{"key":16,"text":17,"correct":14},"B","设计进度控制",{"key":19,"text":20,"correct":14},"C","设计信息管理",{"key":22,"text":23,"correct":24},"D","基于精细化设计理念的数字化模拟与评估",true,"D项属于业主单位在设计管理阶段的内容。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]