[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857969":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},857969,535,1,"单选题","建筑全生命周期是指从( )、规划与设计、建造与运输、运行与维护直到拆除与处理(废弃、再循环和再利用等)的全循环过程。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","分析与准备",false,{"key":16,"text":17,"correct":18},"B","材料与构件生产",true,{"key":20,"text":21,"correct":14},"C","审批",{"key":23,"text":24,"correct":14},"D","初步设计","建筑全生命周期是指从材料与构件生产、规划与设计、建造与运输、运行与维护直到拆除与处理(废弃、再循环和再利用等)的全循环过程。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]