[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857965":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857965,535,1,"单选题","()是项目的最终实现者，是竣工模型的创建者，其关注点是现场实施，关心BIM如何与项目结合，如何提高效率和降低成本。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","设计单位",false,{"key":16,"text":17,"correct":14},"B","监督单位",{"key":19,"text":20,"correct":14},"C","业主单位",{"key":22,"text":23,"correct":24},"D","施工单位",true,"施工单位是项目的最终实现者，是竣工模型的创建者。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]