[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857961":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},857961,535,1,"单选题","()作为项目的最高决策者，负责监督和管理PLMT，对项目负有最终的决策控制权，最终决定项目实施方并签订合同，同时组织、领导和监管各项工作。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","运营方",false,{"key":16,"text":17,"correct":18},"B","业主方",true,{"key":20,"text":21,"correct":14},"C","设计方",{"key":23,"text":24,"correct":14},"D","监理方","组织结构中可知，业主作为项目的最高决策者。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]