[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857954":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857954,535,1,"单选题","下列哪个选项不属于设计单位对BIM项目管理的需求？()",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","安全管理",true,{"key":16,"text":17,"correct":18},"B","提高设计效率",false,{"key":20,"text":21,"correct":18},"C","提高设计质量",{"key":23,"text":24,"correct":18},"D","可视化的设计会审","",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]