[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857953":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857953,535,1,"单选题","目前的设计方式多为( )设计，各专业分工作业，依赖人工协调项目内容和分段，这也导致设计往往存在专业间的碰撞。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","连续式",false,{"key":16,"text":17,"correct":14},"B","独立式",{"key":19,"text":20,"correct":14},"C","关联式",{"key":22,"text":23,"correct":24},"D","隔断式",true,"目前的设计方式多为“隔断式”设计。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]