[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857941":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},857941,535,1,"单选题","设计单位对BIM项目管理的需求不包括()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","提高设计质量",false,{"key":16,"text":17,"correct":14},"B","提高设计效率",{"key":19,"text":20,"correct":21},"C","施工模拟",true,{"key":23,"text":24,"correct":14},"D","可视化的设计会审","设计单位BIM项目管理的应用需求。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]