[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857939":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857939,535,1,"单选题","以下关于在施工方案管理的说法错误的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","BIM建模的过程就是虚拟施工的过程",false,{"key":16,"text":17,"correct":14},"B","虚拟施工技术不仅可以检测和比较施工方案，还可以优化施工方案",{"key":19,"text":20,"correct":14},"C","利用BIM技术进行三维动态展现施工现场布置，划分功能区域，便于场地分析",{"key":22,"text":23,"correct":24},"D","施工方案是可以重复利用的",true,"由于建筑产品的单一性和不可重复性，施工方案具有不可重复性。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]