[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857937":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857937,535,1,"单选题","整个工程项目建设造价控制的关键阶段是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计阶段",true,{"key":16,"text":17,"correct":18},"B","施工阶段",false,{"key":20,"text":21,"correct":18},"C","运维阶段",{"key":23,"text":24,"correct":18},"D","使用阶段","设计阶段是整个工程项目建设造价控制的关键阶段。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]