[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857933":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857933,535,1,"单选题","深化设计阶段的应用点不包括()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","管线综合深化设计",false,{"key":16,"text":17,"correct":14},"B","土建结构深化设计",{"key":19,"text":20,"correct":14},"C","钢结构深化设计",{"key":22,"text":23,"correct":24},"D","施工方案深化设计",true,"BIM应用清单，深化设计阶段包括管线综合深化设计、土建结构深化设计、钢结构深化设计、幕墙深化设计。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]