[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857929":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857929,535,1,"单选题","在设计阶段项目管理工作中应用BIM技术的最终目的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","提高项目设计自身效率",true,{"key":16,"text":17,"correct":18},"B","降低项目成本",false,{"key":20,"text":21,"correct":18},"C","提高项目设计质量",{"key":23,"text":24,"correct":18},"D","便于项目设计信息管理","在设计阶段项目管理工作中应用BIM技术的最终目的是提高项目设计自身的效率，提高设计质量，强化前期决策的及时性和准度，减少后续施工期间的沟通障碍和返工，保障建设周期，降低项目总投资。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]