[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857918":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},857918,535,1,"单选题","项目质量控制是为了确保项目达到客户所规定的质量要求所实施的一系列管理过程，其不包含以下哪项内容？()",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目质量规划",false,{"key":16,"text":17,"correct":14},"B","项目质量控制",{"key":19,"text":20,"correct":21},"C","项目质量提升",true,{"key":23,"text":24,"correct":14},"D","项目质量保证","项目质量控制包括项目质量规划，项目质量控制和项目质量保证等。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]