[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857906":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},857906,535,1,"单选题","以下关于工程变更管理说法正确的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","A.工程变更(EEngineeringChange)，指的是针对未正式投入施工的工程进行的变更",false,{"key":16,"text":17,"correct":18},"B","设计变更应尽量提前，变更发生得越早则损失越小，反之则越大",true,{"key":20,"text":21,"correct":14},"C","几乎所有的工程项目都可能发生变更甚至是频繁的变更，并且这些变更都是有益的",{"key":23,"text":24,"correct":14},"D","引起工程变更的因素及变更产生的时间是可以掌控的","工程变更管理的内容。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]