[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857885":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857885,535,1,"单选题","BIM在项目管理中的会议沟通协调例会上应协调的内容不包括()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","进行模型交底，介绍模型的最新建立和维护情况",false,{"key":16,"text":17,"correct":14},"B","通过模型展示，实现对各专业图纸的会审，及时发现图纸问题",{"key":19,"text":20,"correct":14},"C","随着工程的进度，提前确定模型深化需求，并进行深化模型的任务派发、模型交付以及整合工作，对深化模型确认后出具二维图纸，指导现场施工",{"key":22,"text":23,"correct":24},"D","对项目的最新情况进行评价",true,"",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]