[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857871":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857871,535,1,"单选题","以下关于BIM技术的绿色施工管理说法错误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","节地就是指施工用地的合理利用",true,{"key":16,"text":17,"correct":18},"B","场地分析是研究影响建筑物定位的主要因素，是确定建筑物的空间方位和外观、建立建筑物与周围景观联系的过程",false,{"key":20,"text":21,"correct":18},"C","利用BIM技术，可以对施工过程中的用水过程进行模拟",{"key":23,"text":24,"correct":18},"D","节能在绿色环保有面具体有两种体现，一是帮助建筑形成资源的循环使用；二是实现建筑自身的减排","节地不仅仅是施工用地的合理利用和建筑设计前期的场地分析，运营管理中的空间管理也同样包含在内。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]