[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857867":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857867,535,1,"单选题","基于BIM技术对场地规划实施管理，其具体流程不包括()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","数据优化",true,{"key":16,"text":17,"correct":18},"B","数据准备",false,{"key":20,"text":21,"correct":18},"C","操作实施",{"key":23,"text":24,"correct":18},"D","成果","",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]