[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857866":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857866,535,1,"单选题","项目管理的目标包括供货单位的成本目标、供货的进度目标和供货的()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","质量目标",true,{"key":16,"text":17,"correct":18},"B","实施目标",false,{"key":20,"text":21,"correct":18},"C","保障目标",{"key":23,"text":24,"correct":18},"D","应用目标","项目管理的目标包括供货单位的成本目标、供货的进度目标和供货的质量目标。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]