[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857851":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},857851,535,1,"单选题","下列关于BIM技术在施工图设计阶段的应用说法正确的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工图设计阶段的BIM应用是单专业模型构建并进行二次设计的过程",false,{"key":16,"text":17,"correct":18},"B","施工图设计阶段的BIM应用是各专业模型构建并进行优化设计的复杂过程",true,{"key":20,"text":21,"correct":14},"C","施工图设计阶段的BIM应用的价值就是碰撞检查",{"key":23,"text":24,"correct":14},"D","施工图设计阶段的BIM应用的价值就是管线综合","施工图设计阶段的BIM应用是各专业模型构建并进行优化设计的复杂过程。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]