[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857846":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},857846,535,1,"单选题","项目实施效果评价是指()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","在项目开工之前对项目的评价",false,{"key":16,"text":17,"correct":14},"B","在项目开工以后到项目竣工验收之前任何一个时点所进行的评价",{"key":19,"text":20,"correct":21},"C","在项目竣工一段时间之后进行评价",true,{"key":23,"text":24,"correct":14},"D","在项目后评价报告完成一定时间后进行的评价","项目实施效果评价是指项目竣工一段时间之后所进行的评价。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]