[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857841":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857841,535,1,"单选题","施工管理“三控三管一协调”中的“三控”不包括()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","成本控制",false,{"key":16,"text":17,"correct":14},"B","进度控制",{"key":19,"text":20,"correct":14},"C","质量控制",{"key":22,"text":23,"correct":24},"D","安全控制",true,"“三控三管一协调”，即成本控制、进度控制、质量控制、职业健康安全与环境管理、合同管理、信息管理和组织协调。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]