[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857793":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857793,535,1,"单选题","以下关于建筑全生命周期一体化管理模式说法错误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设项目全生命期一体化管理(PLIM)模式是指由施工单位牵头，专业咨询方全面负责，从各主要参与方中分别选出一至两名专家一起组成全生命期一体化项目管理组",true,{"key":16,"text":17,"correct":18},"B","建设项目全生命期一体化管理模式主要涵盖了三个方面：参与方一体化、管理要素一体化、管理过程一体化",false,{"key":20,"text":21,"correct":18},"C","参与方一体化的实现，有利于各方打破服务时间，服务范围和服务内容上的界限，促进管理过程一体化和管理要素一体化",{"key":23,"text":24,"correct":18},"D","管理过程一体化的实现，又要求打破管理阶段界面，对管理要素一体化的实施起了一定的促进管理作用","建设项目全生命期一体化管理(PLIM)模式是指由业主单位牵头，专业咨询方全面负责，从各主要参与方中分别选出一至两名专家一起组成全生命期一体化项目管理组。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]