[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857782":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},857782,535,1,"单选题","初步设计阶段BIM应用主要方面不包括( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","利用BIM技术进行结构分析",false,{"key":16,"text":17,"correct":14},"B","利用BIM技术进行性能分析",{"key":19,"text":20,"correct":21},"C","利用BIM技术进行场地规划",true,{"key":23,"text":24,"correct":14},"D","利用BIM技术进行工程算量","初步设计阶段BIM应用主要包括结构分析、性能分析和工程算量。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]