[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857781":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},857781,535,1,"单选题","下列关于建筑全生命周期一体化说法正确的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","在建设项目实施阶段，设计方为主要责任和协调方",false,{"key":16,"text":17,"correct":18},"B","在建设项目设计阶段，初步设计方和施工图设计方为主要责任方",true,{"key":20,"text":21,"correct":14},"C","在建设项目运营阶段，业主方为主要负责人",{"key":23,"text":24,"correct":14},"D","建设项目决策阶段，设计方为主要责任和协调方","在建设项目设计阶段，初步设计方和施工图设计方为主要责任方，初步设计方以可行性研究报告、概念设计、规划要求为主要设计依据。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]