[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857770":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},857770,535,1,"单选题","初步设计方和施工图设计方为主要责任方，初步设计方以可行性研究报告、概念设计、规划要求为主要设计依据，通过()与其他各方就设计方案进行反复讨论，确定符合规划的设计方案和规划图，获得业主单位的认可后，将规划图与设计方案交予施工图设计方，施工图设计方同样综合考虑各方意见后形成施工图。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","PKPM",false,{"key":16,"text":17,"correct":18},"B","PLMT",true,{"key":20,"text":21,"correct":14},"C","FTM",{"key":23,"text":24,"correct":14},"D","IPMU","初步设计方和施工图设计方为主要责任方，初步设计方以可行性研究报告、概念设计、规划要求为主要设计依据，通过PLMT与其他各方就设计方案进行反复讨论，确定符合规划的设计方案和规划图，获得业主单位的认可后，将规划图与设计方案交予施工图设计方，施工图设计方同样综合考虑各方意见后形成施工图。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]