[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857762":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857762,535,1,"单选题","以下关于项目管理协同的说法错误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","协同即协调两个以上的不同资源或者个体，协同一致地完成某一目标的过程",true,{"key":16,"text":17,"correct":18},"B","在项目实施过程中对各参与方在各阶段进行信息数据协同管理具有非常重大的意义",false,{"key":20,"text":21,"correct":18},"C","在平面CAD时代，协同是一个单向的过程",{"key":23,"text":24,"correct":18},"D","基于BIM技术的协同平台的利用，可实现各信息、人员的集成和协同，大大提高了项目管理的效率","协同即协调两个或者两个以上的不同资源或者个体，协同一致地完成某一目标的过程或能力。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]