[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857759":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857759,535,1,"单选题","BIM技术在建造阶段上对预制加工管理的应用不包括()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","生成构件加工详图",false,{"key":16,"text":17,"correct":14},"B","进行构件生产指导",{"key":19,"text":20,"correct":14},"C","通过BIM实现预制构件的数字化制造",{"key":22,"text":23,"correct":24},"D","检查构件质量是否达标",true,"预制加工管理。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]