[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857757":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857757,535,1,"单选题","以下关于BIM与施工质量管理的说法错误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工单位是工程高质量的最大受益者，也是工程质量的主要决策人",true,{"key":16,"text":17,"correct":18},"B","BIM是项目管理人员控制工程质量的有效手段",false,{"key":20,"text":21,"correct":18},"C","利用BIM模型和施工方案进行虚拟环境数据集成，对建设项目的可建设性进行仿真实验，可在事前发现质量问题",{"key":23,"text":24,"correct":18},"D","BIM为业主提供形象的三维设计，业主可以更明确地表达自己对工程质量的要求","业主是工程高质量的最大受益者，也是工程质量的主要决策人。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]