[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857752":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},857752,535,1,"单选题","建设项目决策阶段，()为主要责任和协调方，负责收集来自各方的信息，确定初步方案并反馈给业主单位。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","PLMT",true,{"key":16,"text":17,"correct":18},"B","设计单位",false,{"key":20,"text":21,"correct":18},"C","施工单位",{"key":23,"text":24,"correct":18},"D","咨询单位","建设项目决策阶段的运作流程，PLMT为主要责任和协调方，负责收集来自各方的信息，确定初步方案并反馈给业主单位。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]