[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857747":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},857747,535,1,"单选题","以下不属于冲突检查的工作的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建筑与结构专业",false,{"key":16,"text":17,"correct":14},"B","结构与设备专业",{"key":19,"text":20,"correct":14},"C","设备内部各专业",{"key":22,"text":23,"correct":24},"D","设备与室外装修",true,"冲突检查的工作将覆盖任何两个专业之间的冲突关系。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]