[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857746":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},857746,535,1,"单选题","下列关于运维单位项目管理说法不正确的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","规划设计阶段的物业前期介入",false,{"key":16,"text":17,"correct":18},"B","工程建设阶段的物业规划",true,{"key":20,"text":21,"correct":14},"C","接管前的承接查验",{"key":23,"text":24,"correct":14},"D","综合竣工验收后的项目移交接管","物业规划一般属于规划设计阶段的内容。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]