[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-857741":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},857741,535,1,"单选题","利用BIM技术可以对施工场地废弃物的排放、放置进行模拟，以达到减排的目的，具体方法不包括()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","用BIM模型编制专项方案对工地的废水、废弃、废渣的三废排放进行识别、评价和控制安排专人、专项经费，制定专项措施，减少工地现场的三废排放",false,{"key":16,"text":17,"correct":14},"B","根据BIM模型对施工区域的施工废水设置沉淀池，进行沉淀处理后重复使用或合规排放对泥浆及其他不能简单处理的废水集中交由专业单位处理",{"key":19,"text":20,"correct":21},"C","施工垃圾就地焚烧填埋，使用密目式安全网、定期浇水等措施减少施工现场的扬尘",true,{"key":23,"text":24,"correct":14},"D","利用BIM模型合理安排噪声源的放置位置及使用时间，采用有效的噪声防护措施，减少噪声排放","减排措施中第(3)条：禁止在施工现场焚烧垃圾，使用密目式安全网、定期浇水等措施减少施工现场的扬尘。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]